- Size: 30x40x12 - (Lumber & Metal)*
- Pitch: 4/12 Standard Truss
- (2) 9'x10' Garage Doors
- (1) 3'0" x 6'8" Personnel Door
- (5) Windows
- 12" Overhang with Soffit (4-Sides)
* A $1250 NON-REFUNDABLE DEPOSIT WILL BE COLLECTED IN ORDER TO RECEIVE CAD DRAWINGS. WE WILL WORK WITH YOU TO MAKE ADJUSTMENTS FOR PERMIT PURPOSES AS NEEDED. REMAINING BALANCE IS DUE BEFORE MATERIALS ARE ORDERED.
* DELIVERY TO MANY STATES IS INCLUDED IN THE PRICE. CALL OUR OFFICE FOR MORE DETAILS.
* ALL KITS SUBJECT TO A 1.5% HANDLING FEE WHEN PAYING BY CARD.
When the kit is delivered to your location, you’ll be ready to get started and there’ll be less for you to worry about.
Every standard kit contains the highest-quality materials and code-compliant components. Everything you need* is delivered to your building location!
PBS PROVIDES:
- CAD drawing of structure elevation & post location required for building permit.
- Engineer Stamped roof truss loading certification, if required. *If your county requires greater than 30lb snow load, or closer spacing than 4' on center, additional truss costs may be incurred.
- Complete kit of all materials needed to construct your pole building as specified and agreed to in a signed contract.
- PBS Direct will warrant all materials delivered to your job site to be free from structural or workmanship defects and reserves the right to replace any material it deems to be less than PBS Direct's high standard. It does not warrant the performance of products handled improperly or installed improperly or installed differently from their intended use.
NOTE: If something is delivered damaged, we will need for you to notify PBS Direct within 48 hours. We will ask you a few questions and ask for pictures of the damaged materials before making further arrangements.
You PROVIDE:
- Yourself
- Your Tools
- A Helper or Two
- Building permit(s) required by your state, county and/or municipality.
- Site survey and building location information.
What You Get in Your Pole Building Kit:
MATERIAL LIST/CHECKLIST
Please note that once your kit is delivered, you will need to make sure that all material is there. We require that you inspect the delivery as soon as it’s delivered. If there are any materials missing, we will need to hear from you within 48 hours of the delivery. PBS Direct is not responsible for items which turn out missing after the 48 hours.
POSTS:
- 4×6 Posts spaced 8′ on center with Gable Post Extensions to the Top of Trusses (on buildings under 12’ in height)
- 3 Ply 2×6 GluLam (Laminated)Posts, spaced 8′ on center with Gable Posts Extended to Top of Truss (on buildings 12’ or taller)
CARRIERS:
- Headers Engineered Per Code
SKIRTBOARD
PURLINS:
-
2 x 4, spaced 2′ on center
SIDE GIRTS:
-
2 x 4, spaced 2′ on center
TRUSSES:
- 4/12 pitch (Standard). Engineered to be spaced 4′ on center.
FASTENERS:
- Hurricane Ties Per Code
- 1-1/2″ Painted Roofing and Siding Screws
- 2″ Painted Screws for Ridge Cap
- 4″ GRK Screws (Truss Carrier Lags)
- Simpson H2.5A Rafter Ties
- Framing nails
ROOFING:
- G-Rib Metal - 29 gauge, 40 year Warranty panel w/ ThermaGuard Moisture Barrier
SIDING:
- G-Rib Metal - 29 gauge, 40 year warranty Panel w/ House Wrap
METAL TRIM
- Ridge Cap
- Rake & Corner
- Drip Edge
- Fascia Trim
- F&J Channel
- J-Channel
- Double Angle
- Base Angle
- Overhead Door Trim
- Transition Trim
FOOTERS
- Sakrete/Quikrete Dry Pour Concrete
- Concrete Cookie